Kanes Foods – Evesham

The wealthy business associate joins a cross country race with revenge in mind.

Category: Food Preparation       Client: Kanes Foods       Date: 20 June 2016

Kanes Foods contracted Lasercroft to lay BASF products Ucrete UD200 and Mastertop 1325 at their new state of the art factory.
Each area was shotblasted to prepare the concrete and in some areas polymer modified screed was laid to create falls to the new drainage.
Ucrete was chosen by Engineering Director Clive Champion who was insistent on staying with the high quality product which he knows and trusts, despite having numerous cheaper quotes for alternatives.
The total area of Ucrete UD200 applied to the process areas was 4,000m2.

View Project

Other portfolio

See our other portfolio

Kerry Foods

Food Preparation

Excellence is a continuous process and not an accident.